The area of Euston/ Robinvale is a diverse irrigation; horticulture, cropping area, leading into efficient mallee cropping land and large stock runs.

Optimum Constructed two sealed silos in 2004, followed by four in 2007, and six in 2021. This is a great example of working with farmers over multiple generations in their business and ours.

Its always a pleasure dealing with Luke. And the job looks fantastic with two rows showcasing our product over time.

0 views0 comments

Recent Posts

See All

Burtundy Station, NSW

<p>At Optimum Silos, we understand that every primary producers’ needs are different, and every property will require something a little different to achieve its goals. We work closely with our grower

Grain Corp – Boree Creek NSW

<p>Boree Creek Grain Corp site was constructed from scratch in 1999. There are 8 x 3000t Cyclone silos, rail outloading, road in and outloading x 2 and is all run off a PLC touch screen (the height of

Mungo

<p>150km Nth of Ballarnal NSW. This project consists of two 4233 cyclone silos. Optimum Unloaders 120t/hr run off PTO and Hydraulics. Including the walking sweep for improved safety. Project 150km fro