150km Nth of Ballarnal NSW.
This project consists of two 4233 cyclone silos.
Optimum Unloaders 120t/hr run off PTO and Hydraulics. Including the walking sweep for improved safety.
Project 150km from a small town require detailed planning, the land line phone was not operational while the job was conducted so communication was done by satellite email.